The scaffold design was the key element for this project due to the structural engineers having limited information on the make up of the building. This meant careful consideration of the building and making sure the building was not subject to any unnecessary stress with load bearing.
All existing roofs required bridging in which you can see the extent of beam work to transfer the loads to the RC structure and load bearing walls.